Lambert Lane Dip Crossing

Local Municipality Concrete and Stabilization Project Lambert Lane Dip Crossing Scope of Work For the town of Oro Valley, Whelcon Contractors managed the removal of the Lambert Lane Crossing rip rap and asphalt pavement to provide better infrastructure when crossing...
Richmond Magee 17

Richmond Magee 17

Local Municipality Concrete and Slope Stabilization Project Richmond Magee 17 Scope of Work Whelcon Contractors installed three different channels of rip rap for the neighborhood of Richmond American Homes. Each channel involved toe-down excavation and followed all...
Circle K at Ajo & Kinney

Circle K at Ajo & Kinney

Local Municipality Utility, Rip Rap, and Concrete Project Circle K at Ajo & Kinney Scope of Work With the development of new infrastructure in West Tucson, Whelcon Contractors was employed to install an arch culvert on an overpass connecting a Circle K store to...
Humbolt Elementary Field

Humbolt Elementary Field

Local Municipality Utility and Concrete Project Humbolt Elementary Field Scope of Work Whelcon Contractors was hired by the Humboldt Unified School District to assist in completing the school’s field irrigation, field retention, and overall improvements. While...

Downtown Ramps Package 2

Local Municipality Concrete Ramps Project Downtown Ramps Package 2 Scope of Work To help with local city improvements, Whelcon Contractors excavated and poured new ADA-compliant concrete sidewalks and curb access ramps throughout downtown Tucson. This work included...