Local Municipality Concrete and Stabilization Project
Lambert Lane Dip Crossing
Scope of Work
For the town of Oro Valley, Whelcon Contractors managed the removal of the Lambert Lane Crossing rip rap and asphalt pavement to provide better infrastructure when crossing the Canada Del Oro Wash. Along with the excavation of the crossing rip rap and surrounding asphalt Whelcon installed concrete cutoff walls and oversaw the placement of new rip rap.
Key Project Elements
- 204 Square Feet Gabion Mattress Rip Rap
- 108 Linear Feet Gabion End Sill Rip Rap
- 40 Linear Feet 6″ X 3′ Concrete Cut Off
- 42 Linear Feet 9″ X 3′ Concrete Cut Off
Project Location:
Tucson Arizona
Project Owner:
Four Tribes Construction Services, LLC
Project Timeline:
June 2019 – August 2019
Contract Amount:
244,000.00