by Angelina Contreras | Feb 14, 2025 | 237310, NAICS CODES
Local Municipality Concrete, Structural Concrete and Concrete Paving Project Mary Ann Cleveland Shared Pathway Scope of Work [enter the scope of work here] Key Project Elements 740 Ton of Asphaltic Concrete – No. 1, 2 & 3 5 Asphaltic Concrete Speed Tables...
by Angelina Contreras | May 13, 2024 | 237310, NAICS CODES
Federal Concrete Project U.S. Army Corps FY18 Ground Transportation Improvements Scope of Work The project consisted of clearing and grubbing existing vegetation 6’ outside of the existing asphalt road prism. Pipe culverts were replaced, ditches cleaned, erosion...
by Angelina Contreras | May 13, 2024 | 237110, 237310, NAICS CODES
Local Municipality Roadway Project Prop 411 Package 7 – Tierra Del Sol Scope of Work This project includes the demolition of the existing sidewalk and roadway curb to construct new ADA-compliant side ramps. Spanning multiple miles of neighborhoods, Whelcon will...
by Angelina Contreras | May 13, 2024 | 237310, NAICS CODES
Local Municipality Concrete Sidewalk and Ramp Project Wards 1, 2, 5 & 6 ADA Ramp and Sidewalk Scope of Work Encompassing wards 1, 2, 5, and 6, Whelcon will participate in the removal and demolition of existing sidewalks and access curbs. This project, which spans...
by Angelina Contreras | May 13, 2024 | 237310, NAICS CODES
Local Municipality Concrete Sidewalk and Ramps Project Camino De Oeste Access Ramps Scope of Work Whelcon participated in removing previous sidewalks and curb ramps and installing new ADA-compliant access curbs for the communities of Camino de Oeste and Linda...
by Angelina Contreras | May 13, 2024 | 237110, 237310, NAICS CODES
Local Municipality Concrete Sidewalk and Ramps Project Tucson Goodyear FAST Bike Boulevard Scope of Work This project consisted of removing and installing new concrete sidewalks and curb access ramps for FAST Bike Boulevard. Along with new concrete additions, Whelcon...