Local Municipality Concrete Sidewalk and Ramps Project
Tucson Goodyear FAST Bike Boulevard
Scope of Work
This project consisted of removing and installing new concrete sidewalks and curb access ramps for FAST Bike Boulevard. Along with new concrete additions, Whelcon assisted with the adjustment and setting of manholes and water valves. The project spanned across Blacklidge Dr, 9th Ave, 5th St, and 9th St.
Key Project Elements
- 100 Square Feet of 6″ Concrete Sidewalk
- 10 Square Feet of 4″ Concrete Sidewalk
- Reset Frame and Cover for 99 Manholes
- Adjustment of 90 Water Valves and Cover
- 500 Square Feet of Curb Access Ramp
Project Location:
Tucson, Arizona
Project Owner:
City of Tucson
Project Timeline:
June 2023 – January 2024
Contract Amount:
$,1,500,100.00