Local Municipality Roadways Project
Roger Road Pedestrian Safety & Walkability Improvements
Scope of Work
To improve pedestrian safety along Roger Road, concrete sidewalks and ramps were installed from Oracle Road to Romero Road. With this project spanning more than 1.5 miles, Whelcon has installed more than 60,000 square feet of concrete sidewalk, railings, corresponding signage, and managed landscaping.
Key Project Elements
- Installed 65,779 Square Feet of Concrete Sidewalk
- Installed 60 Linear Feet of Concrete Header
- Installed 6,214 Square Feet of Concrete Curb
- Installed 71 ADA Curb Access Ramps (Various Types)
- Built 14,821 Square Feet of Concrete Driveway
- Oversaw Placement of over 2,290 Native Arizona plants along the sidewalk
- Placement of over 30,500 Linear Feet of Irrigation Pipe
- Installed 221 Linear Feet of Barricade Railing
Project Location:
Tucson, Arizona
Project Owner:
City of Tucson
Project Timeline:
October 2024 – April 2025
Contract Amount:
$4,900,300.00