Federal PCCP Project
Buckley Airforce Base Remove and Replace OWS
![Buckley](https://www.whelcon.com/wp-content/uploads/2024/05/Screenshot-2024-05-01-133747.png)
Scope of Work
Remove and Replace Oil Water Separator and Enclose Bay
Key Project Elements
- Excavation, shading and backfill of existing OWS system
- Demolition and disposal of AC, Concrete and existing OWS system
- Concrete flatwork, steel and fiber mesh reinforcement, trench drain and steel bollards
Project Location:
Buckley Air Force Base, Aurora, Colorado
Project Owner:
Four Tribes Construction Services, LLC
Project Timeline:
June 2019 – August 2019
Contract Amount:
$254,000.00
![IMG_8334](https://www.whelcon.com/wp-content/uploads/2024/06/IMG_8334-scaled.jpeg)
Before
![IMG_8395](https://www.whelcon.com/wp-content/uploads/2024/06/IMG_8395-scaled.jpeg)
![IMG_8520](https://www.whelcon.com/wp-content/uploads/2024/06/IMG_8520-scaled.jpeg)
After
![IMG_8683~2](https://www.whelcon.com/wp-content/uploads/2024/06/IMG_86832-scaled.jpeg)
Contact Us
Whelcon Contractors LLC
1 West Wetmore Road, Suite 203
Tucson, AZ 85705
Phone: (520) 314-2001